Planning a cooling conveyor for molded parts
A fan-assisted belt can provide time and airflow between molding and handling. Part thickness, material and geometry influence how quickly it becomes ready for packing.
Estimate travel time from usable cooling length divided by belt speed. Check whether parts overlap or cover surfaces that need airflow.
Record part temperature at discharge and at the next station during a representative run. Use those readings to review the concept.
